• Brace

    Hot-dip galvanized or painted steel. Mounted into the space between Top Cup and Bottom Cup with the swivel Blade. Diagonal braces should be placed on at least every fifth section starting with the outer ones.


  • Transom

    Omega profile welded with Blades, which installed with Top and Bottom Cup. The transoms are installed horizontally and at 90 degrees to the ledger. 

  • Starting Base

    Cuplock Starting Base is one of the bottom components in this system, with Top Cup, Bottom Cup as well as Base Plate. It could offer strong support to upper structure.

  • Ledger

    Hot-dip galvanized steel. Ø 48.3 x 3.0 mm. Mounted into the space between Top Cup and Bottom Cup with the Blade, thus securing a rightangled scaffold. Serves as a guardrail.


  • Vertical Standard

    Hot-dip galvanized steel. Ø 48.3 x 3.2 mm. Equipped with Top Cups and Bottom Cups in which Transoms, Ledgers and Braces are to be mounted. Distance between Rosettes: 500 mm.

CUPLOCK SYSTEM

Cuplock System has been the world's most popular system scaffold. A fully galvanized or painted multi purpose system, it has been chosen by contractors on many of the world's largest and most omplex construction and maintenance projects.